Friday 29 September 2017

SIX SIGMA GREEN BELT IIBM ANSWER SHEET PROVIDED MOB OR WHATSAPP 91 9924764558

IIBM EXAM ANSWER SHEETS PROVIDED.  MBA EMBA BMS DMS ANSWERS PROVIDED.  DR. PRASANTH MBA PH.D. DME MOBILE / WHATSAPP: +91 9924764558 OR +91 9447965521 EMAIL: prasanththampi1975@gmail.com WEBSITE: www.casestudyandprojectreports.com

Six Sigma Green Belt IIBM ANSWER SHEET PROVIDED.

Section A: Objective Type & Short Questions (40 Marks)
 This section consists of Multiple Choice questions.
 Answer all the questions.
 Each question carries 1 mark each.
Part One:
Multiple Choices:
1. The primary purpose of a control chart is to_________
a. Set Specifications and tolerances
b. Compare operations.
c. Determine the stability of a process.
d. Accept or reject a lot of material
2. When a control chart is used on a new process, capability can be assessed at which of the following
times?
a. Before the chart is first started
b. After the first ten points are plotted
c. When the plotted points hug the centerline
d. After the process is shown to be in control
3. Precision is best described as_______
a. A comparison to a known standard
b. The achievement of expected outgoing quality
c. The repeated consistency of results
d. The difference between an average measurement and the actual value
4. The overall ability of two or more operators to obtain consistent results repeatedly when measuring the
same set of parts and using the same measuring equipment is the definition of________
a. Repeatability
b. Precision
c. Reproducibility
d. Accuracy
5. Which of the following conditions must be met for a process to be in a state of statistical control?
a. Most of the product out by the process is in specification.
b. All subgroup averages and rang are within control limits.
c. All variation has been completely removed
d. Previously optimal process settings are used.
6. Which of the following measures of dispersion is equal to the sum of deviations from the mean squared
divided by the sample size?
a. Range
Examination paper of Six Sigma Management

b. Standard deviation
c. Variance
d. Mode
7. An X and R chart is used to_________
a. Indicate process variation
b. Specify design Limits
c. Interpret costs
d. Identify customer expectations
8. Which of the following is the most useful graphical tool for promoting and understanding the process
of capability?
a. A flowchart
b. A histogram
c. An affinity diagram
d. An Ishikawa diagram
9. The type of chart that presents the value of items in descending order is a________
a. Histogram
b. Pareto chart
c. U chart
d. Cusum chart
10. Measures of which of the following provide attributes data?
a. Temperature in degrees
b. Attendance at meetings
c. Weight in pounds
d. Length in metric units
11. The fraction of nonconforming products is plotted on which of the following types of control chart?
a. P chart
b. U chart
c. Np chart
d. C chart
12. A cause and effect diagram is a useful tool for doing which of the following?
a. Determining the flow of a process
b. Detecting shifts in a process
c. Developing theories based on symptoms
d. Arranging theories by defect count
13. Which of the following statistics would best describe the central tendency of a sample of data?
a. Mode
b. Mean
c. Standard deviation
d. Range
14. Which of the following type of tools or techniques is considered qualitative?
a. Histogram
b. Frequency distributions
c. Pareto chart
d. Process observations
Examination paper of Six Sigma Management

15. Out of the following which technique is most useful in narrowing issues and limiting discussion?
a. Brainstorming
b. Quality function deployment
c. Cause and effect analysis
d. Mutilating
16. In statistics, an estimation error that is persistent or systematic is called_________
a. Bias
b. Sensitivity
c. Random
d. Shift
17. For a normal distribution, two standard deviation on each side of the mean would include what
percentage of the total population_______
a. 47%
b. 68%
c. 95%
d. 99%
18. If a distribution is normal, u=50 s=15, what percentage of data will be less than 30?
a. 59.18%
b. 40.82%
c. 9.18%
d. 1.33%
19. A company is receiving an unusually high number of returns from various customers. The first step in
investigating the problem would be to_______
a. Check the inspection records
b. Establish the correlation of the returns to shipments
c. Brainstorm the potential causes
d. Classify the returns by type and degree of serious
20. Which of the following is the best definition of a flow chart?
a. A diagram used to structure ideas into useful categories
b. An illustration used to analyze variation in a process
c. A picture used to separate steps of a process in sequential order
d. An analytical tool used to clarify opposing aspects of a desired change
21. Which of the following activities would NOT contribute to the effective functioning of a team?
a. Eliminating unnecessary activities
b. Development team performance measures
c. Defining process in detail
d. Monitoring each member’s performance
22. What is the standard deviation of the population-10, 4, 16, 12, 8
a. 4.00
b. 4.47
c. 16.00
d. 20.00
23. Which of the following tools would be most appropriate for collecting data to study the symptoms of
a problem?
Examination paper of Six Sigma Management

a. Check sheet
b. Flow diagram
c. Force-field analysis
d. Activity network diagram
24. Which of the following measures is a sufficient statistic for the parameter u?
a. Median
b. Mid-range
c. Mean
d. Mode
25. Positional, cyclical, and temporal variations are most commonly analyzed in_________
a. SPC charts
b. Multi-vari charts
c. Cause and effect diagram
d. Run charts
26. Which of the following describes the deming method for continuous improvement?
a. Cost of quality analysis
b. Process map
c. Tree Diagram
d. Plan-do-check-act cycle
27. In analysis of variance, which of the following distribution is the basis for determining whether the
variance estimates are all from the same population?
a. Chi square
b. Students
c. Normal
d. F
28. Which of the following statement best describes the set of value of a random variable?
a. It is finite.
b. It is an interval
c. It can be discrete or continuous.
d. It can be tracked by using control charts or scatter plots.
29. Which of the following is the best description of randomization?
a. A technique used to increase the precision of an experiment
b. A means of assuring representative sampling
c. The repetition of an observation or measurement
d. The relationship between two or more variables
30. When the order of items is not important, which of the following method is used to determine the
number of sets and subsets of items?
a. Combination
b. Permutation
c. Factorization
d. Simulation
31. Scatter diagrams are best described as_______
a. Histograms.
b. Correlation analysis.
Examination paper of Six Sigma Management

c. Pareto analysis.
d. Ishikawa diagrams.
32. A __________ is created to determine customers of a specific process.
a. Pareto chart
b. Flow diagram
c. Cause and effect diagram
d. Scatter diagram
33. A production line uses signs at specific points on the line to indicate when components or raw
materials need to be replenished. This practice is an example of________
a. Kanban
b. Poka-yake
c. Checkpoints
d. Hoshin
34. Which of the following is a good tool for planning cycle time reduction and concurrent operations?
a. A timeline
b. A Pareto diagram
c. An X and R chart
d. A PERT chart
35. Attribute and variable data are best described as which of the following?
a. Counted values measured values
b. Counted values visual features
c. Measured values counted values
d. Visual features counted values
36. All of the following are common ways for people to react to conflict Except_________
a. Competing
b. Collaborating
c. Avoiding
d. Sabotaging
37. A quality manager has chosen to survey customer satisfaction by taking samples based on the
categories of frequency of use, categories of use, and demographic. This technique is known as_______
a. Random sampling
b. Data collection
c. Stratification
d. Customer classification
38. Which of the following actions is Not used to reduce process cycle time?
a. Analyzing current processes
b. Reducing queue times
c. Setting priorities
d. Implementing activity-based costing
39. A company’s accounts payable department is trying to reduce the time between receipt and payment
of invoices and has recently completed a flowchart. Which of the following tool is the next to be used by
them?
a. Fishbone diagram
b. Scatter diagram
Examination paper of Six Sigma Management

c. Box and whisker plat
d. Histogram
40. In a manufacturing company, the machine shop is what kind of customer in relation to the human
resource department?
a. Intermediate
b. Hidden
c. External
d. Internal
Section B: Short Notes (30 Marks)
 This section consists of Short Notes.
 Answer all the questions.
 Each Short Note carries 6 marks.
1. Describe how QFD fits into the overall DFSS process.
2. What is interrelationship Digraph? Explain it with example.
3. Find the area under the standard normal curve between +1.50 standard deviations and +2.50
standard deviations.
4. Define terms related to One-Way ANOVA and interpret their results & data plots.
5. Define & describe the use of Rational Sub grouping ?
Section C: Applied Theory (30 Marks)
 This section consists of Long Questions.
 Answer all the questions.
 Each question carries 15 marks.
 Detailed information should from the part of your answer (Word limit 200 to 150 words).
1. Suppose you are cooking steak for 100 people, & the current approval rating is 75% acceptable.
You want to know the affect of different methods and approaches to see how the overall approval
or “yield” is affected. By using the Full Factorial method explain how the overall approval or
“yield” is affected.
2. Interpret Control Charts? Distinguish between common & special causes using rules for
determining stastical control.
END OF SECTION A
END OF SECTION B
END OF SECTION C
Examination paper of Six Sigma Management

Six Sigma Black Belt
Section A: Objective Type & Short Questions (40 Marks)
 This section consists of Multiple Choice questions.
 Answer all the questions.
 Part one questions carry 1 mark each & Part Two questions carry 2 marks each.
Part One:
Multiple Choices:
1. Calculate the estimated variance of the population from which the following values have been
randomly selected: 2.8 2.7 2.6 2.9 2.8 2.8 2.8
a. 095
b. 009
c. 088
d. 008
2. The mean, median and mode of a distribution have the same value. What can be said about the
distribution?
a. It is exponential
b. It is normal
c. It is uniform
d. None of the above
3. Approximately what percent of the data values are smaller than the mean?
a. 25%
b. 50%
c. 75%
d. None of above
4. A normal probability plot is used to________
a. Determine whether the distribution is normal
b. Plot Z value
c. Determine process capability
d. It percent out of specification
5. Nominal Group technique is used to_________
a. Help a group reach consensus
b. Generate a group on new ides
c. Provide a consistent stable group leadership
d. Provide a name for the group
6. An example of a project metric would be_______
a. The decrease in defect occurrence
b. The decrease in product cost
Examination paper of Six Sigma Management

c. The decrease in cycle time
d. All the above
7. A correct statement about the relationship between the terms parameter and statistic is:
a. A population statistic is more accurate than a parameter
b. A sample parameter is used to estimate a statistic
c. A sample statistic is used to estimate a population parameter
d. Standard deviation calculation requires both statistics and parameters
8. A and B are events. P(A) = 0.80 and P(B) = 0.90:
a. Events A and B are disjoint or mutually exclusive
b. Events A and B are not disjoint or mutually exclusive
c. P (A and B) = 0
d. P(A and B) = 1.7
9. In a certain sampling situation, a=0, b=0.08. the power of the sampling plan this case is________
a. 0
b. 0.08
c. 1.00
d. 0.92
10. A newspaper article describes a high positive correlation between obesity and orange juice
consumption among six-year-old children’s. Parents who restrict the use of orange juice for their children
have:
a. Made a type I error
b. Made a type II error
c. Misunderstood margin of error
d. Confused correlation with causation
11. In an experimental design context, replications refer to________
a. Duplicating experimental result at another location
b. Repeating a test with the same factor levels
c. Obtaining the same or similar result from different factors
d. Repeating an experiment but using at least one different factor level
12. Find the upper control limit for a range chart if n=4 and the average range is 2.282
a. 2.282
b. 4.564
c. 5.208
d. 3.423
13. An x-bar control chart been established with control limits of 3.245 and 3.257, n=5. An engineer
collects the following sample and plots the average on the control chart:3.257, 3.256, 3.258, 3.259
a. The process is out of control
b. The process is not out of control
c. The engineer misused the control chart
d. The control limits are incorrect
14. TEIZ is an acronym which refers to________
a. A set of problem solving tools
b. An organization of quality professionals
c. An experiment using transitional results
Examination paper of Six Sigma Management

d. A Russian general responsible for creative thinking
15. A robust design is one which.
a. Has high reliability
b. Has low maintenance frequency
c. Is simple to manufacture’
d. Is resistant to varying environmental condition
16. A frequent cause of system sub optimization is_________
a. Optimizing individual process
b. Failing to draw a system flow chart
c. Using data with outliers
d. Failing to consider the normal distribution
17. The x2 distribution is_______
a. Symmetric
b. Left skewed
c. Right skewed
d. Normal
18. An advantage of using standard deviation rather than range for measuring dispersion of a large sample
is that_______
a. Standard deviation has a simpler formula
b. Calculators have a standard deviation key but not a range Key
c. Standard deviation uses information from each measurement
d. Range calculation are not normally distributed
19. The team development stage characterized by expression of individual opinions and ideas often
without regard for team objectives is known as_______
a. Performing
b. Norming
c. Conflicting
d. Storming
20. SMED is an acronym for activity that________
a. Involve housekeeping in the work area
b. Makes mistake of a certain type impossible
c. Emphasizes the pull of the customer
d. Reduces set up the time
21. A principle advantage of fractional factorial experimental designs is_________
a. Reduced cost
b. Improved accuracy
c. Increased confounding
d. Higher confidence level
22. Dr. W Edwards Deming_______
a. Lectured in Japan after World War II
b. Was an author of several books in the US
c. Is considered an expert in the quality field
d. All of the above
Examination paper of Six Sigma Management

PART TWO:
23. What percent of population falls below the lower specification limits?
a. 9.18%
b. 22.66%
c. 6.68%
d. 1.83%
24. Find the mean, median and mode of the following data set:9, 11, 12, 14, 18, 18, 18, 20, 23:
a. 15.5, 18, 18
b. 15, 14, 18
c. 15, 12, 18
d. 15.5, 16, 18
Use for problems 25-27:
A B Res.
25. Calculate the main effect of factor A:
a. 20
b. 25
c. 30
d. None of the above
26. Calculate the interaction effect:
a. 20
b. 25
c. 40
d. None of the above
27. If it is desirable to maximize the response R, the following levels should be used:
a. A+ and B+
b. A+ and Bc.
A- and B+
d. None of the above
Use for questions 28-30:
Here is an experimental design with result:
A B C
Responses
1
- - +
10 11 10
2 - + -
22 20 23
1 - - 20
2 - + 30
3 + - 40
4 + + 50
Examination paper of Six Sigma Management

3 + + +
34 36 37
4 + - -
26 25 25
28. This experimental design is:
a. Full factorial
b. Half factorial
c. Quarter factorial
d. None of the above
29. The number of factors, levels and replications:
a. 3, 3, 3
b. 3, 2, 2
c. 3, 2, 3
d. None of the above
30. An indication of the experimental error is available because the design has:
a. Multiple replications
b. Multiple levels
c. Multiple factors
d. None of the above
31. The average number of defects is 21.6. Find the upper control limit for the C-chart.
a. 26.4
b. 24.6
c. 26.2
d. None of the above
Section B: Short Notes (30 Marks)
 This section consists of Short Notes.
 Answer all the questions.
 Each Short Note carries 6 marks.
1. Briefly define Affinity Diagram with an example.
2. By using imaginary figures draw a Run Chart.
3. Consider the following data & develop a normal probability graph paper & normal probability
plot:
7.9, 9.7, 10.6, 12.7, 12.8, 18.1, 21.2, 33.0, 43.5, 51.1, 81.4, 93.1
4. A painting process produces coatings with a thickness of 0.0005 & a standard deviation of
0.00002. What should the tolerance limits be for this process? Briefly explain Tolerance design?
5. What is Pugh matrix? State the steps which are used in Pugh matrix.
END OF SECTION A
Examination paper of Six Sigma Management
12
IIBM Institute of Business Management
Section C: Applied Theory (30 Marks)
 This section consists of Long Questions.
 Answer all the questions.
 Each question carries 15 marks.
 Detailed information should from the part of your answer (Word limit 200 to 150 words).
1. Define & describe the purpose of root cause analysis? Recognize the issues involved in
identifying a root cause analysis and list various tools for resolving chronic problem?
2. Describe the purpose & elements of FMEA including risk priority number (RPN), and evaluate
FMEA results for processes, products, & services. Distinguish between design FMEA (DFMEA)
& process FMEA (PFMEA) and interpret results from each?
S-2-300813
END OF SECTION B
END OF SECTION C

No comments:

Post a Comment